New contract for Akva group

Published Modified

The contract totals NOK 15,5 mill. (EUR 1,9 mill.) and includes one 480t “AkvaCenter Fjord” feed barge with a turn-key installed 6-line feed system, miscellaneous accessories, SmartEye camera systems for all cages and one environmental monitoring station (EAP). In addition, the contract includes an identical equipment package for an existing feed barge, 25 additional SmartEye camera systems and two EAPs for two other farm sites, and an upgrade package for an existing quattro feed system to a 6-line system for a fifth farm site. The equipment will be delivered during 2008 to Salmar’s farms in Norway.